Performance & consumption analytics

Find the hours your arcs aren't burning.

WeldCloud Productivity turns machine data into arc time, fusion rate, wire, gas and energy figures you can act on — per welder, per machine, per site, in real time.

30 days free · No credit card required

WeldCloud Productivity Site: Laxå · This week
Arc time
34%
▲ 6 pts vs. last week
Wire used
412 kg
1.2 mm G3Si1
Energy
1860
kWh
Arc time by station Target 40%
ST-01ST-02ST-03ST-04ST-05ST-06ST-07ST-08
Live view · 14 arcs on
ST-05 · Warrior 500iWelding
ST-03 · Aristo 500ixWelding
ST-04 · Rebel EMPIdle 22 min
What it measures

The numbers behind every arc.

Data comes straight off the power source — no manual logging, no estimates. Slice it by machine, welder, station, shift or assembly.

Utilization
Arc time & duty cycle

See how much of a shift is actually spent welding, where the idle hours sit, and which stations are carrying the load.

Arc time %Idle gapsShift compare
Consumption
Wire, gas & energy

Deposition and consumable spend per job, so quoting is based on what the shop really uses rather than a rule of thumb.

Fusion rateGas flowkWh
Cost
Cost per weld hour

Put a price on wire, gas and energy and every hour of arc time carries a real cost — per machine, per job, per site.

Consumable costEnergy costQuoting
KPI Targets

Set a target per site or station and watch progress against it — no spreadsheet in the middle.

Custom Reports

Build the view you need once, schedule it, and have it land in the right inbox every Monday.

Multi-site Rollup

Compare plants on the same metrics, with each site keeping its own detailed view.

Live view

See the floor as it welds

A live board of every connected machine — welding, idle or offline — with the current job and operator. Supervisors stop walking the shop to find out where the bottleneck is.

  • Machine state updated in seconds
  • Idle-time alerts by station or cell
  • Works on a shop-floor screen or a phone
Live view · Laxå Streaming
ST-01
Warrior 500i
WELDING
182 A · 24.1 V
ST-02
Aristo 500ix
IDLE 22M
Last arc 09:14
ST-03
Rebel EMP 285
WELDING
146 A · 21.8 V
ST-04
Warrior 400i
OFFLINE
Since 07:02
ST-05
Aristo 500ix
WELDING
210 A · 26.4 V
ST-06
Renegade ES 300i
WELDING
128 A · 22.0 V
Reports

The weekly report writes itself

Choose the metrics, the grouping and the period once. Productivity assembles the report on schedule and sends it as PDF or exports the raw rows for your own analysis.

  • Scheduled PDF and CSV delivery
  • Group by welder, machine, station or assembly
  • API access for your BI stack
Weekly productivity · Week 31 Scheduled
WelderArc timeWireEnergy
A. Lindqvist41%88 kg402 kWh
M. Andersson37%74 kg351 kWh
J. Bergqvist24%51 kg240 kWh
K. Nyström39%82 kg379 kWh
Improve

Prove the change actually worked

Set a baseline before a process change, then compare the same period after. Arc time, consumables and energy side by side — the payback on a new torch or a re-layout stops being a guess.

  • Period-over-period comparison
  • Cost per metre of weld
  • Energy figures for sustainability reporting
Comparison
Before vs. after · Cell B
+18%
Arc time · before28%
Arc time · after46%
Wire per part−9%

Start measuring what the shop actually does.

Connect one machine and you'll have a week of real arc data before your next production meeting.

Start free trial

30 days · No credit card · Cancel anytime